
101st Airborne
Format: Paperback
ISBN13: 9781612004235
Paperback|9781612004235
✨ Featured Offer
Used, Like New
$13.93
List Price: $16.95
🚚
See all 5 offers from $8.68 FREE standard delivery by: 03 Apr 2026
Overview
The Past & Present Series reconstructs historical battles by using photography, juxtaposing modern views with those of the past. It shows how much infastructure has remained and points to the passing nature of things such as outfits, uniforms, and ephemera.
After its operations in the Cotentin and around Carentan, the 101st was withdrawn from the lines in late June and sailed back to England on LSTs in July. After several false alerts, they invaded by air again into the Netherlands on September 17, 1944, part of the airborne element of Operation "Market Garden." The mission was to hold open Hell's Highway so that land forces could advance safely to Arnhem.
Operation "Market Garden" is a strongly debated subject among WW2 historians: was it a brave attempt to end the war early that foundered for being a bridge too far, or was it, rather, an ill-conceived waste of resources that should have been used on another Front? With hindsight, there's no doubt that the operation was a daring--if not risky--attempt to attack deep into enemy territory proposed by a general often disparaged for being too conservative.
But at the beginning of September, it seemed to the Allied commanders that the enemy was disorganized; it had lost many men, huge numbers of vehicles, and had retreated helter-skelter through France and Belgium. In reality, the Germans had already started brilliant fire brigade reorganization and would soon have an effective defense throughout the Netherlands.
101st parachuted right into the middle of enemy territory and north of Eindhoven. They met little resistance to begin with and captured most of their initial objectives by the end of 17 September. But the Germans managed to demolish the division's primary objective, a bridge over the Wilhelmina Canal at Son, forcing the 101st to attempted to capture a similar bridge a few kilometers away at Best. They found the approach blocked but continued to hold territory enabling engineers to rebuild the demolished bridge. Other divisional units continued moving to the south and eventually reached the northern end of Eindhoven. In the following days they successfully defended the town of Veghel but failed to take the City of Helmond. As Operation "Market Garden" progressed, the rest of the 101st Airborne Division joined the 82nd Airborne Division on the island to the north of Nijmegen. The Screaming Eagles saw seventy-two days of fierce round-the-clock fighting against crack German troops and showed their fighting ability and tenacity.
After its operations in the Cotentin and around Carentan, the 101st was withdrawn from the lines in late June and sailed back to England on LSTs in July. After several false alerts, they invaded by air again into the Netherlands on September 17, 1944, part of the airborne element of Operation "Market Garden." The mission was to hold open Hell's Highway so that land forces could advance safely to Arnhem.
Operation "Market Garden" is a strongly debated subject among WW2 historians: was it a brave attempt to end the war early that foundered for being a bridge too far, or was it, rather, an ill-conceived waste of resources that should have been used on another Front? With hindsight, there's no doubt that the operation was a daring--if not risky--attempt to attack deep into enemy territory proposed by a general often disparaged for being too conservative.
But at the beginning of September, it seemed to the Allied commanders that the enemy was disorganized; it had lost many men, huge numbers of vehicles, and had retreated helter-skelter through France and Belgium. In reality, the Germans had already started brilliant fire brigade reorganization and would soon have an effective defense throughout the Netherlands.
101st parachuted right into the middle of enemy territory and north of Eindhoven. They met little resistance to begin with and captured most of their initial objectives by the end of 17 September. But the Germans managed to demolish the division's primary objective, a bridge over the Wilhelmina Canal at Son, forcing the 101st to attempted to capture a similar bridge a few kilometers away at Best. They found the approach blocked but continued to hold territory enabling engineers to rebuild the demolished bridge. Other divisional units continued moving to the south and eventually reached the northern end of Eindhoven. In the following days they successfully defended the town of Veghel but failed to take the City of Helmond. As Operation "Market Garden" progressed, the rest of the 101st Airborne Division joined the 82nd Airborne Division on the island to the north of Nijmegen. The Screaming Eagles saw seventy-two days of fierce round-the-clock fighting against crack German troops and showed their fighting ability and tenacity.
| ISBN-13 | 9781612004235 |
|---|---|
| ISBN-10 | 1612004237 |
| Weight | 0.45 Pounds |
| Dimensions | 7.30 x 0.10 x 9.70 In |
| List Price | $16.95 |
| Format | Paperback |
|---|---|
| Language | English |
| Publisher | Casemate |
| Published On | 2016-10-17 |
View All Offers
Sort by:
Price
Condition
Seller
Seller Comments
Price
Used, Very Good
Seller details
Books From California
Simi Valley, CA, USA
Very Clean Copy-Over 500, 000 Internet Orders Filled.
Free delivery by: 03 Apr 2026
Used, Very Good
Seller details
Books From California
Simi Valley, CA, USA
Very Clean Copy-Over 500, 000 Internet Orders Filled.
Free delivery by: 03 Apr 2026
Used, Very Good
Seller details
HPB-Diamond
Dallas, TX, USA
Connecting readers with great books since 1972! Used books may not include companion materials, and ...
Free delivery by: 03 Apr 2026
Used, Very Good
Seller details
HPB-Emerald
Dallas, TX, USA
Connecting readers with great books since 1972! Used books may not include companion materials, and ...
Free delivery by: 03 Apr 2026
✨ Used, Like New
Seller details
Book Outpost
Pittsburgh, PA, USA
Never used! Light wear to corners/edges from shelving. Wholesale pricing available via Amazon busi...
Free delivery by: 03 Apr 2026